Electrical Work @ APN admin Posted on April 8, 2014 Posted in APN Electrical Work last few months have been wiring New Super maxi Node #3 (fourth node at APN) for CMRI to control P-1 and P-2 detections blocks and Signals. This is a picture of Node #1