Summer Project 2016 – Not Steel Mill Modeling Part 4a ( Mother Nature Intervenes )
Pool Construction came to a grinding halt with over 4 inches of rain in the last week :
Mother nature decides that we needed a frog pond instead of a pool,
Now with only light scattered showers this week in the forecast, the task to pump the pond dry, and continue Pool install begins today.
Note Hole (Pond) dimensions are 45′ long x 23′ wide, and about 27″ deep or about 2380.5 Cubic Feet and approximately 17,807 gallons of water.